Western Steel Buildings WESTERN STEEL Jobsite Inventory
--

Project Manager
Western Steel Buildings

Connect to your database

One-time setup on this device. Get both values from your Supabase project under Project Settings → API. The anon key is safe to use here; never paste the service_role key.

Stored only in this browser. To ship it to every PM instead, fill in WSB_CONFIG at the top of this file before hosting it.

Western Steel Buildings

Jobsite Inventory

Sign in with your Western Steel account.

or

Use a password instead

Change database connection

Jobs with imported shippers
Inventory verified
0%
0 of 0 line items confirmed on site
Verified
0
0 pieces checked
Remaining
0
awaiting verification
Flagged
0
short, damaged or over
Verification log · timestamped proof
Which lines does this cover?
Photos
Your call
Verify line item
On shipper
Part no.
Description
Bundle
Category
Confirm by the label. Read the count off the tag on the box, bundle or crate. Do not open it.
Expected
Timestamp and GPS are saved with this line as proof.
Set a password

So you can sign in without waiting for an email. Your address stays .

Report details
These print on page 1 of the client report, above the liability wording. Fill them once per delivery.
The party the report is addressed to, which is often not the project name.
Project—
A count can run over two days. Both dates print.
The state the material was in when counted, not a map pin.
Writes a bullet per section from what you have already verified or flagged. Read it, fix it, make it yours — it is the part of the report the client actually reads.